April 29, 2020 Site Visit

The stairway bannisters and iron spindles are in for our gorgeous circular stairs.

It’s been a very productive few weeks at the new build. Many things are finished or very close to completion. Enough design features are done such that we can really visual how the house is going to look. May will be a month of painting all the walls and completing the outside decks and stairs.

Outside the stone work is almost done….we’ll post pictures next week once the scaffolding is down. Inside, the kitchen is almost done, the main bar cabinetry and countertop is in.

The lower level pub bar is coming together with the back wall being outfitted with reclaimed wood and floating shelves. Ennodio will be building a lower cabinet and more reclaimed wood for the front of the bar. The lower level powder has a cool feature wall behind the copper sink.

We also finalized all the window treatments….no small feat when you have as many windows as we do! Lastly, we arranged for all the cement work to be done….front porch and quite a bit of color, stamped concrete for the back patios.

Leave a comment