May 21st, 2020 Site a Update

Outside we have several important items being completed or constructed. The Trex decking system is almost complete as well as the T&G ceiling for the lower level covered patio. The front porch and several misc cement areas were poured and formed, and the raised fire pit platform was constructed. Soon we will be able to visualize the backyard as the patios are created!

Leave a comment