I went to the job site twice this week and we have a lot of people working on different trades. The electrical work is well advance, the HVAC units installed, soon we are having heat available, the subs are going to be happy. The plumbing is 90% completed and the low voltage wires for the smart home system is progressing.

The turret has been a challenge for all the subs. While talking to them, they describe it as a very difficult and time consuming. I tell them it is a gift from my wife, now they know what it takes. These are some pictures of the turret from inside and outside:

The outside of the house is starting to look amazing as it comes with the amazing views of the mountain.